The staging yards
Most tracks cannot be seen. The lower level is completely hidden from the spectator. It contains three hidden yards with 23 staging tracks in total. The huge capacity guarantees a diverse traffic flow. The two main hidden yards are interconnected. A fully loaded ore train will always run in one direction, while an unloaded one will run in the opposite direction.
2007